Archived case studies
Discover more about the global projects James Fisher Strainstall is involved with.
Browse our case studies using the links below to find out how we support our clients in a range of market sectors.
13/10/2016
Measuring success | 50 years of James Fisher Strainstall
With half a century of experience in load monitoring and systems providing, James Fisher Strainstall is a world leader in developing solutions that enhance the safety and performance of customers’ assets.
04/11/2015
Protecting Qatari heritage building
During enabling works for the new National Museum of Qatar, Strainstall Middle East monitor vibrations and ground water levels around the old Amiri Palace.
04/11/2015
CrackFirst™ fatigue monitoring
James Fisher Strainstall commissioned to install CrackFirst™ sensors onto a multi-purpose cargo vessel.
04/11/2015
Jamarat Bridge
Strainstall measures deflection on Jamarat Bridge, Saudi Arabia.
03/11/2015
Structural monitoring system
Strainstall Middle East was contracted to provide a complete monitoring system to measure elastic shortening within the tower's structure and stress within the core walls and columns.
03/11/2015
Sheikh Zayad Bridge
Strainstall Middle East was contracted to install K type thermocouples in the east main pier, the reading of which were taken manually during the curing process.
20/10/2015
Structural monitoring of Burj Khalifa Tower
Strainstall undertake structural monitoring of the world's tallest ever man-made structure.
02/10/2014
Thelwall viaduct monitored by JF Strainstall
JF Strainstall has been commissioned to install a monitoring system on the Thelwall Viaduct.
22/07/2013
JF Strainstall undertake monitoring on Lunan Bridge
JF Strainstall undertake full instrumentation and monitoring of the Lunan Viaduct in Scotland.
13/05/2013
Monitoring Strainstall's developments
Strainstall has mechanical, electrical, electronic and software engineering capabilities available in-house to consistently develop new products and technology.