Archived case studies
Discover more about the global projects James Fisher Strainstall is involved with.
Browse our case studies using the links below to find out how we support our clients in a range of market sectors.
03/04/2013
Gandhinagar metro bi-directional static load testing
Strainstall performed bi-directional static load testing for the proposed Metro Express for Gandhinagar and Ahmedabad (MEGA), in India.
04/03/2013
Structural monitoring of Blackfriars Bridge
JF Strainstall designed and installed its comprehensive load and environmental monitoring system for Blackfriars Bridge, UK.
10/08/2012
Monitoring ship canal bridges
In-situ load testing and long-term monitoring of Latchford cantilever bridge.
07/08/2012
Jiangyin Yangtze Bridge monitoring
James Fisher Strainstall designs fibre optic, computer-networked structural monitoring system for the Jiangyin Yangtze Bridge.
13/06/2012
Vibration monitoring on the M6 motorway
JF Strainstall contribute to Highways Agency project with monitoring vibration levels on motorway bridge.
08/06/2011
Bridge monitoring at Spaghetti Junction
JF Strainstall employs a sophisticated, computer-controlled monitoring system to ensure safety at a bridge repair project on the Gravelly Hill Interchange.
05/04/2010
Structural monitoring for offshore wind turbine foundations
James Fisher Strainstall install an array of strain gauges, displacement sensors, accelerometers, and bespoke monitoring equipment on offshore wind farm developments.