Archived case studies

Discover more about the global projects James Fisher Strainstall is involved with.

Browse our case studies using the links below to find out how we support our clients in a range of market sectors.

  Grid view

03/11/2015
Structural monitoring system

Strainstall Middle East was contracted to provide a complete monitoring system to measure elastic shortening within the tower's structure and stress within the core walls and columns.

03/11/2015
Sheikh Zayad Bridge

Strainstall Middle East was contracted to install K type thermocouples in the east main pier, the reading of which were taken manually during the curing process.

20/10/2015
Anchor line load monitoring system

Strainstall installs an anchor line load monitoring system for the FPSO Cidade de Anchieta.

20/10/2015
Structural monitoring of Burj Khalifa Tower

Strainstall undertake structural monitoring of the world's tallest ever man-made structure.

02/10/2014
Thelwall viaduct monitored by JF Strainstall

JF Strainstall has been commissioned to install a monitoring system on the Thelwall Viaduct.

11/06/2014
Quick release mooring hooks for Portsmouth Port

James Fisher Strainstall's quick release mooring hooks improve safety and efficiency at Portsmouth International Port, UK.

07/03/2014
Taking the strain

Meeting the demands and environmental factors of the oil and gas industry requires the very best of design, materials and testing.

22/07/2013
JF Strainstall undertake monitoring on Lunan Bridge

JF Strainstall undertake full instrumentation and monitoring of the Lunan Viaduct in Scotland.

13/05/2013
Monitoring Strainstall's developments

Strainstall has mechanical, electrical, electronic and software engineering capabilities available in-house to consistently develop new products and technology.

03/04/2013
Data logging for New Year's Eve

James Fisher Strainstall monitors bending stresses for New Year's Eve celebrations in Times Square.
BACK TO TOP