Archived case studies

Discover more about the global projects James Fisher Strainstall is involved with.

Browse our case studies using the links below to find out how we support our clients in a range of market sectors.

  Grid view

09/09/2020
James Fisher Strainstall partners with First Subsea on world’s largest floating offshore wind farm

James Fisher Strainstall – a leading UK-based developer of load monitoring solutions – is supporting the world’s largest floating offshore wind farm (FLOW) to enhance safety and provide critical data insights. Implemented by First Subsea onto their Platform Mooring Connectors (PMCs), Strainstall’s patented Strain Ring technology enables developers to increase platform safety and cost-efficiency through design optimisation and value engineering.

02/09/2020
James Fisher Strainstall supports Mammoet’s heavy lifting operations

James Fisher Strainstall’s wireless load monitoring solution enables Mammoet to safely and efficiently transport 60 heavy-duty petrochemical modules within its demanding timeframe.

30/04/2020
James Fisher Strainstall monitoring system secures oil production for Petrofac

James Fisher Strainstall develops custom-built chain tension monitoring system (CTMS™) for Petrofac’s FPF1 platform to mitigate the risk of HSE incidents and NPT

02/01/2020
JF Strainstall’s Container Weighing System (CWS) triples container weighing speed for Yilport Ferrol

Yilport Ferrol implement JF Strainstall CWS integrating seamlessly with existing reach stacker or port container handling equipment enabling them to meet SOLAS requirements whilst increasing port efficiency.

21/10/2019
SAMS deployed on Bath Abbey organ

JF Strainstall was contracted to undertake crucial structural health monitoring on the Klais organ at Bath Abbey.

19/09/2019
MOL LNG Transport (Europe) Ltd equip SmartLoad® load monitoring for safer lifting operations

MOL LNG Transport (Europe) Ltd approached Scotload to deliver a solution that protects on-board assets and personnel.

30/07/2019
Bridgestrike installed on two key bridges for London Underground

JF Strainstall, contracted by London Underground on behalf of Transport for London, installed a collision detection system, Bridgestrike, on two bridges in London.

04/07/2019
Channel tunnel investigation undertaken by JF Strainstall

JF Strainstall was contracted by Balfour Beatty Utility Solutions to understand the behaviour of diesel exhaust fumes in turbulent airflow within the Channel Tunnel in London.

12/06/2019
JF Strainstall commissions structural health monitoring solution on the Queensferry Crossing

JF Strainstall working for the Forth Crossing Bridge Constructors Joint Venture designed, installed and commissioned a complete Structural Health Monitoring (SHM) solution for the Queensferry Crossing.

05/06/2019
JF Strainstall delivers structural health monitoring project on three Normandy bridges

JF Strainstall, in partnership with the civil engineering consultants COWI, have designed and installed integrated structural health monitoring (SHM) solutions on three bridges in Normandy.
BACK TO TOP