- Markets
- Oil and gas
- Renewables
- Ports and terminals
- Bridges
- Civil and construction
- Highway infrastructure
- Rail infrastructure
- JF Strainstall - Structural monitoring
- AXILOG II vibration monitoring system
- BGCMAP rate of corrosion tester
- Dynasen shock pressure sensor products
- TDR2/TECO/TECOLITE pile integrity testing systems
- ASLT/SLT2 static pile load testing system
- SIMBAT dynamic pile test system
- PARAS parallel seismic test system
- PLATEMAN plate loading test system
- SB2010 large scale shear box
- SCXT3000 cross hole sonic logging system
- SLFI signal lever force indicator
- SPTMAN SPT hammer energy testing system
- Concrete slab void detection system
- Measurement and control
- Load pins
- Load links
- Load shackles
- Tension and compression load cells
- Tension load cells
- Train brake force measuring load cells
- Strain rings
- Below ground corrosion assessment
- Bi-directional static load testing
- Cross hole sonic logging
- Dynamic pile testing
- Parallel seismic testing
- Pile integrity testing
- Static load testing
- Sale of the UK operations of Strainstall to the BES Group
- James Fisher Strainstall provides structural health monitoring system for the world’s tallest railway bridge
- James Fisher Strainstall secures Palace of Westminster instrumentation and monitoring contract
- James Fisher combines its asset monitoring capabilities under the new brand of James Fisher Strainstall
- Archive
JF Strainstall has devised a number of techniques for identifying and managing hidden defects in moveable bridges.
See our mini case studies below or contact our team to discuss your structural monitoring requirements,
M5 / M6 Midlands links
Hidden defect: Un-inspectable details
Problem: Data relating to bearing behaviour was required to plan maintenance work on multiple motorway links.
Solution: JF Strainstall set up monitoring at four separate locations on the Midlands links in order to gather information about the actual behaviour of bearings and supporting structures, facilitating maintenance planning.
Somerleyton / Reedham
Hidden defect: Articulation and load bearing issues
Problem: General structural performance.
Solution: Monitoring was implemented in order to identify how the bridge was operating and where the load paths were under trafficking.